Kashan high school
Kashan high school
Employer: Schools Reconstruction Main Department, Isfahan Province
Design Time: 2007
Design Location: Kashan.Iran
Project Status: Designed
Project Area: 1768 M2
Employer: Schools Reconstruction Main Department, Isfahan Province
Design Time: 2007
Design Location: Kashan.Iran
Project Status: Designed
Project Area: 1768 M2
This project is located in the Kashan, Iran with a hot, dry climate. The main lines of the design and space creation have been formed with respect to the constraints and the idiosyncrasies of the climate. This harmony with Nature in the design has given rise to a form-based concentration, a central landscape and a shaded expanse under the pilot. To this end, native materials harmonious with the climate have been used. For another quality of the project, mention can be made of the utilized roof surfaces designed for games and proper lighting in that they give directions to solids
This project is located in the Kashan, Iran with a hot, dry climate. The main lines of the design and space creation have been formed with respect to the constraints and the idiosyncrasies of the climate. This harmony with Nature in the design has given rise to a form-based concentration, a central landscape and a shaded expanse under the pilot. To this end, native materials harmonious with the climate have been used. For another quality of the project, mention can be made of the utilized roof surfaces designed for games and proper lighting in that they give directions to solids
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.